Novarly ParcelRenewable sites

Renewable sitesBanbeath Industrial Estate Solar Array

Banbeath Industrial Estate Solar Array

Banbeath Industrial Estate Solar Array is a 4.19 MW solar farm under construction in Fife. Planning permission was granted on 30 September 2022, 14 months after submission. Operator of record: RWE Renewables UK Limited.

4.19 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
RWE Renewables UK Limited
Fife
Authority
Scotland

Planning and build timeline

Application submitted13 August 2021
Permission granted30 September 2022
14 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Fife approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Banbeath Industrial Estate Solar Array’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Fife’s record on solar

Fife has decided 31 solar farms and approved 100%, taking a median of 3.7 months. See every solar farm decision in Fife

Other built sites within 15 km

SiteMWDistance
Biomass (dedicated) · Operational
5.52.1 km
Hydrogen · Under Construction
2.2 km
Wind Onshore · Operational
18.44.4 km
Wind Offshore · Operational
76.1 km
Biomass (dedicated) · Operational
658.4 km
Solar Photovoltaics · Operational
58.6 km
Wind Onshore · Operational
1.59 km
Wind Onshore · Operational
1.59.1 km

How big is Banbeath Industrial Estate Solar Array?

Banbeath Industrial Estate Solar Array has a recorded installed capacity of 4.19 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Banbeath Industrial Estate Solar Array?

REPD records the operator as RWE Renewables UK Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Banbeath Industrial Estate Solar Array approved and built?

The application was submitted on 13 August 2021. Permission was granted on 30 September 2022, 14 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9500.

Novarly Parcel · official public data, read properly · parcel.novarly.com