Banbeath Industrial Estate Solar Array is under construction in Fife with a recorded capacity of 4.19 MW.

4.19 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
RWE Renewables UK Limited
Fife
Authority
Scotland

Planning and build timeline

Application submitted2021-08-13
Permission granted2022-09-30
14 months after submission
Operationalnot recorded

Fife’s record on solar

Fife has decided 31 solar farms and approved 100%, taking a median of 3.7 months. See every solar farm decision in Fife

Other built sites within 15 km

SiteMWDistance
Diageo Biomass Energy Project
Biomass (dedicated) · Operational
5.52.1 km
Fife Energy Park - H100 Fife Hydrogen Demonstration Project
Hydrogen · Under Construction
2.2 km
Earlseat
Wind Onshore · Operational
18.44.4 km
Levenmouth demonstration turbine (Fife Energy Park)
Wind Offshore · Operational
76.1 km
Markinch Biomass CHP Plant
Biomass (dedicated) · Operational
658.4 km
West Strathore Solar Limited
Solar Photovoltaics · Operational
58.6 km
Skeddoway Farm Wind Turbine
Wind Onshore · Operational
1.59 km
Noble Foods
Wind Onshore · Operational
1.59.1 km

How big is Banbeath Industrial Estate Solar Array?

Banbeath Industrial Estate Solar Array has a recorded installed capacity of 4.19 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Banbeath Industrial Estate Solar Array?

REPD records the operator as RWE Renewables UK Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Banbeath Industrial Estate Solar Array approved and built?

The application was submitted on 2021-08-13. Permission was granted on 2022-09-30, 14 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9500.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council