Lower Melville Wood

Lower Melville Wood is operational in Fife with a recorded capacity of 1 MW, and has been generating since 2007-02-28.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2007-02-28
Landfill Gas
Technology
Fife Council
Fife
Authority
Scotland

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2007-02-28

Other built sites within 15 km

SiteMWDistance
Ferrymuir
Battery · Under Construction
49.95.9 km
Cupar Wastewater Treatment Works Solar Farm
Solar Photovoltaics · Operational
0.629.3 km
Pitkevy Farm - Battery Storage Facility
Battery · Under Construction
10.1 km
Markinch Biomass CHP Plant
Biomass (dedicated) · Operational
6510.3 km
Balsillie Avenue - Roaring Hill Energy Storage Facility
Battery · Under Construction
19.910.4 km
Jamesfield Organic Centre - Battery Storage
Battery · Operational
4912 km
Errol Estate
Solar Photovoltaics · Operational
1312.2 km
Banbeath Industrial Estate Solar Array
Solar Photovoltaics · Under Construction
4.1912.3 km

How big is Lower Melville Wood?

Lower Melville Wood has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lower Melville Wood?

REPD records the operator as Fife Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lower Melville Wood approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2007-02-28.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 697.