Lower Melville Wood

Lower Melville Wood is an operational 1 MW landfill gas site in Fife, generating since 28 February 2007. REPD does not record the planning grant date. Operator of record: Fife Council.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 28 February 2007
Landfill Gas
Technology
Fife Council
Fife
Authority
Scotland

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational28 February 2007

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Fife: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Lower Melville Wood’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
49.95.9 km
Solar Photovoltaics · Operational
0.629.3 km
Battery · Under Construction
10.1 km
Biomass (dedicated) · Operational
6510.3 km
Battery · Under Construction
19.910.4 km
Battery · Operational
4912 km
Solar Photovoltaics · Operational
1312.2 km
Solar Photovoltaics · Under Construction
4.1912.3 km

How big is Lower Melville Wood?

Lower Melville Wood has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lower Melville Wood?

REPD records the operator as Fife Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lower Melville Wood approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 28 February 2007.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 697.