Renewable sites › Royal Surrey County Hospital - Solar Panels
Royal Surrey County Hospital - Solar Panels
Royal Surrey County Hospital - Solar Panels is under construction in Guildford.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Albury Landfill Landfill Gas · Operational | 1.5 | 8.4 km |
Runfold Landfill Landfill Gas · Operational | 1.2 | 11.1 km |
Farnborough International Exhibition Centre, Etps Road - Solar Panels Solar Photovoltaics · Under Construction | 1.15 | 11.3 km |
Farnborough Airport - Solar Panels Solar Photovoltaics · Operational | 1.7 | 12.7 km |
Dunsfold Park Solar Farm Solar Photovoltaics · Operational | 2 | 14.2 km |
How big is Royal Surrey County Hospital - Solar Panels?
REPD does not record an installed capacity for Royal Surrey County Hospital - Solar Panels.
Who operates Royal Surrey County Hospital - Solar Panels?
REPD records the operator as The Royal Surrey County Hospital. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Royal Surrey County Hospital - Solar Panels approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 18998.