Renewable sites › Royal Surrey County Hospital - Solar Panels
Royal Surrey County Hospital - Solar Panels
Royal Surrey County Hospital - Solar Panels is a solar farm under construction in Guildford. REPD does not record the planning grant date. Operator of record: The Royal Surrey County Hospital.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | not recorded |
Screening a site of your own?
Redline runs the record on your own boundary in Guildford: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Royal Surrey County Hospital - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 1.5 | 8.4 km |
Landfill Gas · Operational | 1.2 | 11.1 km |
Solar Photovoltaics · Under Construction | 1.15 | 11.3 km |
Solar Photovoltaics · Operational | 1.7 | 12.7 km |
Solar Photovoltaics · Operational | 2 | 14.2 km |
How big is Royal Surrey County Hospital - Solar Panels?
REPD does not record an installed capacity for Royal Surrey County Hospital - Solar Panels.
Who operates Royal Surrey County Hospital - Solar Panels?
REPD records the operator as The Royal Surrey County Hospital. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Royal Surrey County Hospital - Solar Panels approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 18998.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode