Runfold Landfill

Runfold Landfill is operational in Waverley with a recorded capacity of 1.2 MW, and has been generating since 2005-10-01.

1.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2005-10-01
Landfill Gas
Technology
SITA UK
Waverley
Authority
England

Planning and build timeline

Application submitted2003-03-04
Permission granted2003-07-15
4 months after submission
Operational2005-10-01
27 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Farnham Landfill
Landfill Gas · Operational
2.45.2 km
Marsh House Solar Park
Solar Photovoltaics · Operational
5.56.2 km
Farnborough International Exhibition Centre, Etps Road - Solar Panels
Solar Photovoltaics · Under Construction
1.156.6 km
Farnborough Airport - Solar Panels
Solar Photovoltaics · Operational
1.77.3 km
Hungerford Farm
Solar Photovoltaics · Operational
510.7 km
Royal Surrey County Hospital - Solar Panels
Solar Photovoltaics · Under Construction
11.1 km
Taplins Farm solar park
Solar Photovoltaics · Operational
5.911.5 km

How big is Runfold Landfill?

Runfold Landfill has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Runfold Landfill?

REPD records the operator as SITA UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Runfold Landfill approved and built?

The application was submitted on 2003-03-04. Permission was granted on 2003-07-15, 4 months later. The site became operational on 2005-10-01, 27 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 710.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council