Elton solar farm is operational in Rushcliffe with a recorded capacity of 5 MW, and has been generating since 2015-08-01.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-08-01
Solar Photovoltaics
Technology
Valfortec
Rushcliffe
Authority
England

Planning and build timeline

Application submitted2014-08-14
Permission granted2015-02-13
6 months after submission
Operational2015-08-01
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Rushcliffe’s record on solar

Rushcliffe has decided 30 solar farms and approved 90%, taking a median of 4.7 months. See every solar farm decision in Rushcliffe

Other built sites within 15 km

SiteMWDistance
Lodge Farm - Orston
Solar Photovoltaics · Operational
12.42.2 km
Langar Lane
Solar Photovoltaics · Operational
108.6 km
Grantham Solar Farm
Solar Photovoltaics · Operational
58.8 km
Grange Solar Farm
Solar Photovoltaics · Operational
4.69.2 km
Marston Solar Farm
Solar Photovoltaics · Operational
4.910.8 km
Copley Farm
Solar Photovoltaics · Operational
3011.2 km
Hawton Wind Farm
Wind Onshore · Operational
911.4 km
Balderton
Biomass (dedicated) · Operational
20.311.4 km

How big is Elton solar farm?

Elton solar farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Elton solar farm?

REPD records the operator as Valfortec. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Elton solar farm approved and built?

The application was submitted on 2014-08-14. Permission was granted on 2015-02-13, 6 months later. The site became operational on 2015-08-01, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2247.