Renewable sites › Copley Farm
Copley Farm
Copley Farm is an operational 30 MW solar farm in South Kesteven, generating since 13 January 2016. Planning permission was granted on 6 January 2015, 12 months after submission. Operator of record: TGC Renewables.
Planning and build timeline
| Application submitted | 13 January 2014 |
| Permission granted | 6 January 2015 12 months after submission |
| Operational | 13 January 2016 12 months after consent |
Screening a site of your own?
South Kesteven approves 86% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Copley Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
South Kesteven’s record on solar
South Kesteven has decided 28 solar farms and approved 86%, taking a median of 3.1 months. See every solar farm decision in South Kesteven →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 4.6 | 5.4 km |
Solar Photovoltaics · Operational | 5 | 5.7 km |
Biomass (dedicated) · Operational | 20.3 | 5.8 km |
Wind Onshore · Operational | 9 | 6 km |
Solar Photovoltaics · Operational | 4.9 | 6.6 km |
Solar Photovoltaics · Operational | 49.9 | 6.7 km |
Solar Photovoltaics · Operational | 12.4 | 9 km |
Battery · Under Construction | 360 | 10.8 km |
How big is Copley Farm?
Copley Farm has a recorded installed capacity of 30 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Copley Farm?
REPD records the operator as TGC Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Copley Farm approved and built?
The application was submitted on 13 January 2014. Permission was granted on 6 January 2015, 12 months later. The site became operational on 13 January 2016, 12 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1752.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode