Novarly ParcelRenewable sites

Renewable sitesGrange Solar Farm

Grange Solar Farm

Grange Solar Farm is operational in Newark and Sherwood with a recorded capacity of 4.6 MW, and has been generating since 2011-07-13.

4.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-07-13
Solar Photovoltaics
Technology
Lark Energy
Newark and Sherwood
Authority
England

Planning and build timeline

Application submitted2011-02-25
Permission granted2011-05-25
3 months after submission
Operational2011-07-13
2 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Newark and Sherwood’s record on solar

Newark and Sherwood has decided 25 solar farms and approved 96%, taking a median of 4.9 months. See every solar farm decision in Newark and Sherwood

Other built sites within 15 km

SiteMWDistance
Balderton
Biomass (dedicated) · Operational
20.32.2 km
Hawton Wind Farm
Wind Onshore · Operational
92.2 km
The Grange
Solar Photovoltaics · Operational
49.92.6 km
Copley Farm
Solar Photovoltaics · Operational
305.4 km
Staythorpe Road - Battery energy storage
Battery · Under Construction
3606.7 km
Lodge Farm - Orston
Solar Photovoltaics · Operational
12.47 km
Grantham Solar Farm
Solar Photovoltaics · Operational
58.9 km
Elton solar farm
Solar Photovoltaics · Operational
59.2 km

How big is Grange Solar Farm?

Grange Solar Farm has a recorded installed capacity of 4.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Grange Solar Farm?

REPD records the operator as Lark Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Grange Solar Farm approved and built?

The application was submitted on 2011-02-25. Permission was granted on 2011-05-25, 3 months later. The site became operational on 2011-07-13, 2 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1040.

Novarly Parcel · official public data, read properly · parcel.novarly.com