Renewable sites › Balderton
Balderton
Balderton is operational in Newark and Sherwood with a recorded capacity of 20.3 MW, and has been generating since 2015-07-08.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2015-07-08 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Hawton Wind Farm Wind Onshore · Operational | 9 | 0.2 km |
The Grange Solar Photovoltaics · Operational | 49.9 | 0.9 km |
Grange Solar Farm Solar Photovoltaics · Operational | 4.6 | 2.2 km |
Staythorpe Road - Battery energy storage Battery · Under Construction | 360 | 5.1 km |
Copley Farm Solar Photovoltaics · Operational | 30 | 5.8 km |
Lodge Farm - Orston Solar Photovoltaics · Operational | 12.4 | 9.2 km |
Grantham Solar Farm Solar Photovoltaics · Operational | 5 | 10.4 km |
Elton solar farm Solar Photovoltaics · Operational | 5 | 11.4 km |
How big is Balderton?
Balderton has a recorded installed capacity of 20.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Balderton?
REPD records the operator as SPEP. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Balderton approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2015-07-08.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6166.