Marston Solar Farm

Marston Solar Farm is an operational 4.9 MW solar farm in South Kesteven, generating since 18 July 2011. Planning permission was granted on 19 May 2011, 2 months after submission. Operator of record: Lark Energy.

4.9 MW
Capacity
as recorded in REPD
Operational
Status
since 18 July 2011
Solar Photovoltaics
Technology
Lark Energy
South Kesteven
Authority
England

Planning and build timeline

Application submitted29 March 2011
Permission granted19 May 2011
2 months after submission
Operational18 July 2011
2 months after consent

Screening a site of your own?

RedlineUK · £39

South Kesteven approves 86% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Marston Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Kesteven’s record on solar

South Kesteven has decided 28 solar farms and approved 86%, taking a median of 3.1 months. See every solar farm decision in South Kesteven

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
52.1 km
Solar Photovoltaics · Operational
306.6 km
Solar Photovoltaics · Operational
12.49.5 km
Solar Photovoltaics · Operational
4.610.6 km
Solar Photovoltaics · Operational
510.8 km
Solar Photovoltaics · Operational
511.4 km
Biomass (dedicated) · Operational
20.311.9 km
Wind Onshore · Operational
912.1 km

How big is Marston Solar Farm?

Marston Solar Farm has a recorded installed capacity of 4.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Marston Solar Farm?

REPD records the operator as Lark Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Marston Solar Farm approved and built?

The application was submitted on 29 March 2011. Permission was granted on 19 May 2011, 2 months later. The site became operational on 18 July 2011, 2 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1433.