Renewable sites › Langar Lane
Langar Lane
Langar Lane is operational in Rushcliffe with a recorded capacity of 10 MW, and has been generating since 2016-06-15.
Planning and build timeline
| Application submitted | 2014-08-06 |
| Permission granted | 2014-12-05 4 months after submission |
| Operational | 2016-06-15 18 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Rushcliffe’s record on solar
Rushcliffe has decided 30 solar farms and approved 90%, taking a median of 4.7 months. See every solar farm decision in Rushcliffe →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Cotgrave solar farm Solar Photovoltaics · Operational | 4.9 | 6.9 km |
Stragglethorpe Road farm Solar Photovoltaics · Operational | 5 | 7.2 km |
Radcliffe Solar Farm Solar Photovoltaics · Operational | 4.2 | 8.2 km |
Elton solar farm Solar Photovoltaics · Operational | 5 | 8.6 km |
The Sawmill Biomass (dedicated) · Operational | 6.8 | 8.9 km |
British Geological, Keywork Solar Panels Solar Photovoltaics · Under Construction | 0.62 | 9 km |
Colwick Industrial Estate (Farm and Food waste) Anaerobic Digestion · Operational | 2 | 9.1 km |
Stoke Bardolph energy crop (Farm AD) Anaerobic Digestion · Operational | 2 | 10.1 km |
How big is Langar Lane?
Langar Lane has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Langar Lane?
REPD records the operator as Kappa Solar/ OPDE. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Langar Lane approved and built?
The application was submitted on 2014-08-06. Permission was granted on 2014-12-05, 4 months later. The site became operational on 2016-06-15, 18 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2210.
Novarly Parcel · official public data, read properly · parcel.novarly.com