Grantham Solar Farm

Grantham Solar Farm is operational in South Kesteven with a recorded capacity of 5 MW, and has been generating since 2015-12-15.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-12-15
Solar Photovoltaics
Technology
British Solar Renewables
South Kesteven
Authority
England

Planning and build timeline

Application submitted2015-04-02
Permission granted2015-06-24
3 months after submission
Operational2015-12-15
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Kesteven’s record on solar

South Kesteven has decided 28 solar farms and approved 86%, taking a median of 3.1 months. See every solar farm decision in South Kesteven

Other built sites within 15 km

SiteMWDistance
Marston Solar Farm
Solar Photovoltaics · Operational
4.92.1 km
Copley Farm
Solar Photovoltaics · Operational
305.7 km
Lodge Farm - Orston
Solar Photovoltaics · Operational
12.47.4 km
Elton solar farm
Solar Photovoltaics · Operational
58.8 km
Grange Solar Farm
Solar Photovoltaics · Operational
4.68.9 km
Balderton
Biomass (dedicated) · Operational
20.310.4 km
Hawton Wind Farm
Wind Onshore · Operational
910.6 km
The Grange
Solar Photovoltaics · Operational
49.911.2 km

How big is Grantham Solar Farm?

Grantham Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Grantham Solar Farm?

REPD records the operator as British Solar Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Grantham Solar Farm approved and built?

The application was submitted on 2015-04-02. Permission was granted on 2015-06-24, 3 months later. The site became operational on 2015-12-15, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5149.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council