Novarly ParcelRenewable sites

Renewable sitesLodge Farm - Orston

Lodge Farm - Orston

Lodge Farm - Orston is operational in Rushcliffe with a recorded capacity of 12.4 MW, and has been generating since 2014-03-28.

12.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-03-28
Solar Photovoltaics
Technology
Lightsource Renewable Energy
Rushcliffe
Authority
England

Planning and build timeline

Application submitted2013-08-16
Permission granted2013-11-15
3 months after submission
Operational2014-03-28
4 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Rushcliffe’s record on solar

Rushcliffe has decided 30 solar farms and approved 90%, taking a median of 4.7 months. See every solar farm decision in Rushcliffe

Other built sites within 15 km

SiteMWDistance
Elton solar farm
Solar Photovoltaics · Operational
52.2 km
Grange Solar Farm
Solar Photovoltaics · Operational
4.67 km
Grantham Solar Farm
Solar Photovoltaics · Operational
57.4 km
Copley Farm
Solar Photovoltaics · Operational
309 km
Hawton Wind Farm
Wind Onshore · Operational
99.2 km
Balderton
Biomass (dedicated) · Operational
20.39.2 km
The Grange
Solar Photovoltaics · Operational
49.99.4 km
Marston Solar Farm
Solar Photovoltaics · Operational
4.99.5 km

How big is Lodge Farm - Orston?

Lodge Farm - Orston has a recorded installed capacity of 12.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lodge Farm - Orston?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lodge Farm - Orston approved and built?

The application was submitted on 2013-08-16. Permission was granted on 2013-11-15, 3 months later. The site became operational on 2014-03-28, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1498.