Renewable sitesEbnal Lodge

Ebnal Lodge

Ebnal Lodge is operational in Shropshire with a recorded capacity of 5 MW, and has been generating since 2017-02-15.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-02-15
Solar Photovoltaics
Technology
Greencoat Capital
Shropshire
Authority
England

Planning and build timeline

Application submitted2015-09-23
Permission granted2015-12-23
3 months after submission
Operational2017-02-15
14 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Shropshire’s record on solar

Shropshire has decided 68 solar farms and approved 94%, taking a median of 3.2 months. See every solar farm decision in Shropshire

Other built sites within 15 km

SiteMWDistance
Knolton Farmhouse Cheese Solar Farm
Solar Photovoltaics · Operational
17.6 km
Pen y Bont
Landfill Gas · Operational
2.37.9 km
Trench Farm
Solar Photovoltaics · Operational
7.28.3 km
Abbots moor Farm Anaerobic Digester (Farm AD)
Anaerobic Digestion · Operational
18.9 km
ABP Ellesmere Abbatoir
Biomass (dedicated) · Operational
1.19.4 km
Penycae Solar Farm
Solar Photovoltaics · Operational
510.3 km
Land Opposite Tyn Y Pistyll
Solar Photovoltaics · Operational
510.4 km
Ruabon
Landfill Gas · Operational
2.111 km

How big is Ebnal Lodge?

Ebnal Lodge has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ebnal Lodge?

REPD records the operator as Greencoat Capital. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ebnal Lodge approved and built?

The application was submitted on 2015-09-23. Permission was granted on 2015-12-23, 3 months later. The site became operational on 2017-02-15, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5834.

Novarly Parcel · official public data, read properly · parcel.novarly.com