Renewable sites › ABP Ellesmere Abbatoir
ABP Ellesmere Abbatoir
ABP Ellesmere Abbatoir is an operational 1.1 MW biomass plant in Shropshire, generating since 14 September 2015. REPD does not record the planning grant date. Operator of record: ABP Ellesmere.
Planning and build timeline
| Application submitted | 20 May 2010 |
| Permission granted | not recorded |
| Operational | 14 September 2015 |
Screening a site of your own?
Redline runs the record on your own boundary in Shropshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with ABP Ellesmere Abbatoir’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Operational | 1 | 2.7 km |
Solar Photovoltaics · Operational | 3.8 | 6 km |
Solar Photovoltaics · Operational | 14.4 | 6.9 km |
Solar Photovoltaics · Operational | 5 | 9.4 km |
Solar Photovoltaics · Operational | 7.2 | 10.2 km |
Solar Photovoltaics · Operational | 1 | 12.3 km |
How big is ABP Ellesmere Abbatoir?
ABP Ellesmere Abbatoir has a recorded installed capacity of 1.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates ABP Ellesmere Abbatoir?
REPD records the operator as ABP Ellesmere. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was ABP Ellesmere Abbatoir approved and built?
The application was submitted on 20 May 2010. REPD does not record a grant date. The site became operational on 14 September 2015.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6488.