Knolton Farmhouse Cheese Solar Farm
Knolton Farmhouse Cheese Solar Farm is an operational 1 MW solar farm in Wrexham, generating since 1 March 2016. Planning permission was granted on 1 June 2015, 2 months after submission. Operator of record: Pegasus Group.
Planning and build timeline
| Application submitted | 2 April 2015 |
| Permission granted | 1 June 2015 2 months after submission |
| Operational | 1 March 2016 9 months after consent |
Screening a site of your own?
Wrexham approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Knolton Farmhouse Cheese Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.
Wrexham’s record on solar
Wrexham has decided 15 solar farms and approved 100%, taking a median of 5 months. See every solar farm decision in Wrexham →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 7.2 | 3 km |
Landfill Gas · Operational | 2.3 | 6.8 km |
Landfill Gas · Operational | 2.1 | 7.4 km |
Solar Photovoltaics · Operational | 3.6 | 7.6 km |
Solar Photovoltaics · Operational | 5 | 7.6 km |
Solar Photovoltaics · Operational | 5 | 7.7 km |
Solar Photovoltaics · Operational | 5 | 8.1 km |
Solar Photovoltaics · Operational | 5 | 8.3 km |
How big is Knolton Farmhouse Cheese Solar Farm?
Knolton Farmhouse Cheese Solar Farm has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Knolton Farmhouse Cheese Solar Farm?
REPD records the operator as Pegasus Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Knolton Farmhouse Cheese Solar Farm approved and built?
The application was submitted on 2 April 2015. Permission was granted on 1 June 2015, 2 months later. The site became operational on 1 March 2016, 9 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5147.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode