Novarly ParcelRenewable sites

Renewable sitesKnolton Farmhouse Cheese Solar Farm

Knolton Farmhouse Cheese Solar Farm

Knolton Farmhouse Cheese Solar Farm is operational in Wrexham with a recorded capacity of 1 MW, and has been generating since 2016-03-01.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-03-01
Solar Photovoltaics
Technology
Pegasus Group
Wrexham
Authority
Wales

Planning and build timeline

Application submitted2015-04-02
Permission granted2015-06-01
2 months after submission
Operational2016-03-01
9 months after consent

Wrexham’s record on solar

Wrexham has decided 15 solar farms and approved 100%, taking a median of 5 months. See every solar farm decision in Wrexham

Other built sites within 15 km

SiteMWDistance
Trench Farm
Solar Photovoltaics · Operational
7.23 km
Pen y Bont
Landfill Gas · Operational
2.36.8 km
Ruabon
Landfill Gas · Operational
2.17.4 km
Land NW Of Pickhill Bridge Farm
Solar Photovoltaics · Operational
3.67.6 km
Ebnal Lodge
Solar Photovoltaics · Operational
57.6 km
Penycae Solar Farm
Solar Photovoltaics · Operational
57.7 km
Williams Farm
Solar Photovoltaics · Operational
58.1 km
Land Opposite Tyn Y Pistyll
Solar Photovoltaics · Operational
58.3 km

How big is Knolton Farmhouse Cheese Solar Farm?

Knolton Farmhouse Cheese Solar Farm has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Knolton Farmhouse Cheese Solar Farm?

REPD records the operator as Pegasus Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Knolton Farmhouse Cheese Solar Farm approved and built?

The application was submitted on 2015-04-02. Permission was granted on 2015-06-01, 2 months later. The site became operational on 2016-03-01, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5147.