Knolton Farmhouse Cheese Solar Farm is operational in Wrexham with a recorded capacity of 1 MW, and has been generating since 2016-03-01.
Planning and build timeline
| Application submitted | 2015-04-02 |
| Permission granted | 2015-06-01 2 months after submission |
| Operational | 2016-03-01 9 months after consent |
Wrexham’s record on solar
Wrexham has decided 15 solar farms and approved 100%, taking a median of 5 months. See every solar farm decision in Wrexham →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Trench Farm Solar Photovoltaics · Operational | 7.2 | 3 km |
Pen y Bont Landfill Gas · Operational | 2.3 | 6.8 km |
Ruabon Landfill Gas · Operational | 2.1 | 7.4 km |
Land NW Of Pickhill Bridge Farm Solar Photovoltaics · Operational | 3.6 | 7.6 km |
Ebnal Lodge Solar Photovoltaics · Operational | 5 | 7.6 km |
Penycae Solar Farm Solar Photovoltaics · Operational | 5 | 7.7 km |
Williams Farm Solar Photovoltaics · Operational | 5 | 8.1 km |
Land Opposite Tyn Y Pistyll Solar Photovoltaics · Operational | 5 | 8.3 km |
How big is Knolton Farmhouse Cheese Solar Farm?
Knolton Farmhouse Cheese Solar Farm has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Knolton Farmhouse Cheese Solar Farm?
REPD records the operator as Pegasus Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Knolton Farmhouse Cheese Solar Farm approved and built?
The application was submitted on 2015-04-02. Permission was granted on 2015-06-01, 2 months later. The site became operational on 2016-03-01, 9 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5147.