Novarly ParcelRenewable sites

Renewable sitesEast Langford Farm

East Langford Farm

East Langford Farm is operational in Cornwall with a recorded capacity of 5 MW, and has been generating since 2011-07-25.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-07-25
Solar Photovoltaics
Technology
Low carbon Solar Partners
Cornwall
Authority
England

Planning and build timeline

Application submitted2011-02-12
Permission granted2011-04-18
2 months after submission
Operational2011-07-25
3 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cornwall’s record on solar

Cornwall has decided 146 solar farms and approved 92%, taking a median of 3.3 months. See every solar farm decision in Cornwall

Other built sites within 15 km

SiteMWDistance
East Youlstone Wind Farm
Wind Onshore · Operational
45.4 km
Pitworthy Farm Solar Park
Solar Photovoltaics · Operational
15.65.4 km
Crimp Wind Farm
Wind Onshore · Operational
2.46.3 km
North Tamar Environ Project - Holsworthy (Farm AD)
Anaerobic Digestion · Operational
1.47.1 km
Chester Energy (East Woolley Farm)
Solar Photovoltaics · Operational
57.3 km
Great Knowle Farm Solar
Solar Photovoltaics · Operational
38.1 km
Derriton Fields Solar Farm
Solar Photovoltaics · Operational
11.88.6 km
Derril Water Solar Farm - Solar Farm
Solar Photovoltaics · Operational
428.8 km

How big is East Langford Farm?

East Langford Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates East Langford Farm?

REPD records the operator as Low carbon Solar Partners. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was East Langford Farm approved and built?

The application was submitted on 2011-02-12. Permission was granted on 2011-04-18, 2 months later. The site became operational on 2011-07-25, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1022.