Novarly ParcelRenewable sites

Renewable sitesNorth Tamar Environ Project - Holsworthy (Farm AD)

North Tamar Environ Project - Holsworthy (Farm AD)

North Tamar Environ Project - Holsworthy (Farm AD) is operational in Torridge with a recorded capacity of 1.4 MW, and has been generating since 2002-07-18.

1.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2002-07-18
Anaerobic Digestion
Technology
Holsworthy Biogas Company ( North Tamar Business Network)
Torridge
Authority
England

Planning and build timeline

Application submitted1998-12-21
Permission granted1999-05-14
5 months after submission
Operational2002-07-18
38 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Derriton Fields Solar Farm
Solar Photovoltaics · Operational
11.83 km
Great Knowle Farm Solar
Solar Photovoltaics · Operational
33.2 km
Foxcombe Farm Solar Park
Solar Photovoltaics · Operational
55 km
Pitworthy Farm Solar Park
Solar Photovoltaics · Operational
15.65.4 km
Land West of Parsonage Wood
Solar Photovoltaics · Operational
4.25.4 km
CRINACOTT SOLAR FARM (Pyworthy)
Solar Photovoltaics · Operational
6.75.4 km
EASTACOMBE SOLAR FARM
Solar Photovoltaics · Operational
3.66.2 km
Derril Water Solar Farm - Solar Farm
Solar Photovoltaics · Operational
426.3 km

How big is North Tamar Environ Project - Holsworthy (Farm AD)?

North Tamar Environ Project - Holsworthy (Farm AD) has a recorded installed capacity of 1.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates North Tamar Environ Project - Holsworthy (Farm AD)?

REPD records the operator as Holsworthy Biogas Company ( North Tamar Business Network). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was North Tamar Environ Project - Holsworthy (Farm AD) approved and built?

The application was submitted on 1998-12-21. Permission was granted on 1999-05-14, 5 months later. The site became operational on 2002-07-18, 38 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 209.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council