Novarly ParcelRenewable sites

Renewable sitesNorth Tamar Environ Project - Holsworthy (Farm AD)

North Tamar Environ Project - Holsworthy (Farm AD)

North Tamar Environ Project - Holsworthy (Farm AD) is an operational 1.4 MW anaerobic digestion plant in Torridge, generating since 18 July 2002. Planning permission was granted on 14 May 1999, 5 months after submission. Operator of record: Holsworthy Biogas Company ( North Tamar Business Network).

1.4 MW
Capacity
as recorded in REPD
Operational
Status
since 18 July 2002
Anaerobic Digestion
Technology
Holsworthy Biogas Company ( North Tamar Business Network)
Torridge
Authority
England

Planning and build timeline

Application submitted21 December 1998
Permission granted14 May 1999
5 months after submission
Operational18 July 2002
38 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Torridge: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with North Tamar Environ Project - Holsworthy (Farm AD)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
11.83 km
Solar Photovoltaics · Operational
33.2 km
Solar Photovoltaics · Operational
55 km
Solar Photovoltaics · Operational
15.65.4 km
Solar Photovoltaics · Operational
4.25.4 km
Solar Photovoltaics · Operational
6.75.4 km
Solar Photovoltaics · Operational
3.66.2 km
Solar Photovoltaics · Operational
426.3 km

How big is North Tamar Environ Project - Holsworthy (Farm AD)?

North Tamar Environ Project - Holsworthy (Farm AD) has a recorded installed capacity of 1.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates North Tamar Environ Project - Holsworthy (Farm AD)?

REPD records the operator as Holsworthy Biogas Company ( North Tamar Business Network). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was North Tamar Environ Project - Holsworthy (Farm AD) approved and built?

The application was submitted on 21 December 1998. Permission was granted on 14 May 1999, 5 months later. The site became operational on 18 July 2002, 38 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 209.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode