Renewable sites › Pitworthy Farm Solar Park
Pitworthy Farm Solar Park
Pitworthy Farm Solar Park is operational in Torridge with a recorded capacity of 15.6 MW, and has been generating since 2014-03-31.
Planning and build timeline
| Application submitted | 2012-10-18 |
| Permission granted | 2013-07-04 9 months after submission |
| Operational | 2014-03-31 9 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Torridge’s record on solar
Torridge has decided 28 solar farms and approved 96%, taking a median of 3.6 months. See every solar farm decision in Torridge →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Derril Water Solar Farm - Solar Farm Solar Photovoltaics · Operational | 42 | 3.4 km |
CRINACOTT SOLAR FARM (Pyworthy) Solar Photovoltaics · Operational | 6.7 | 3.9 km |
Land West of Parsonage Wood Solar Photovoltaics · Operational | 4.2 | 4 km |
Great Knowle Farm Solar Solar Photovoltaics · Operational | 3 | 4 km |
Bradford Solar Park Solar Photovoltaics · Operational | 5.3 | 4.6 km |
Derriton Fields Solar Farm Solar Photovoltaics · Operational | 11.8 | 4.7 km |
North Tamar Environ Project - Holsworthy (Farm AD) Anaerobic Digestion · Operational | 1.4 | 5.4 km |
East Langford Farm Solar Photovoltaics · Operational | 5 | 5.4 km |
How big is Pitworthy Farm Solar Park?
Pitworthy Farm Solar Park has a recorded installed capacity of 15.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Pitworthy Farm Solar Park?
REPD records the operator as Hive Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Pitworthy Farm Solar Park approved and built?
The application was submitted on 2012-10-18. Permission was granted on 2013-07-04, 9 months later. The site became operational on 2014-03-31, 9 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2013.