Dunlop Landfill Gas Scheme

Dunlop Landfill Gas Scheme is an operational 2.4 MW landfill gas site in East Ayrshire, generating since 15 April 2003. Planning permission was granted on 27 September 2000, 8 months after submission. Operator of record: Natural Power.

2.4 MW
Capacity
as recorded in REPD
Operational
Status
since 15 April 2003
Landfill Gas
Technology
Natural Power
East Ayrshire
Authority
Scotland

Planning and build timeline

Application submitted17 January 2000
Permission granted27 September 2000
8 months after submission
Operational15 April 2003
31 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in East Ayrshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Dunlop Landfill Gas Scheme’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
9.22.5 km
Wind Onshore · Operational
129.7 km
Wind Onshore · Under Construction
4511.1 km
Wind Onshore · Operational
4.712.9 km
Battery · Under Construction
5013 km
Wind Onshore · Operational
1.813.2 km
Wind Onshore · Operational
10813.4 km
Wind Onshore · Operational
32213.6 km

How big is Dunlop Landfill Gas Scheme?

Dunlop Landfill Gas Scheme has a recorded installed capacity of 2.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dunlop Landfill Gas Scheme?

REPD records the operator as Natural Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dunlop Landfill Gas Scheme approved and built?

The application was submitted on 17 January 2000. Permission was granted on 27 September 2000, 8 months later. The site became operational on 15 April 2003, 31 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 746.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode