Dudley EfW

Dudley EfW is an operational 7.4 MW energy-from-waste plant in Dudley, generating since 1 February 1998. Planning permission was granted on 1 February 1996, 17 months after submission. Operator of record: MES Environmental (CNIM Group).

7.4 MW
Capacity
as recorded in REPD
Operational
Status
since 1 February 1998
EfW Incineration
Technology
MES Environmental (CNIM Group)
Dudley
Authority
England

Planning and build timeline

Application submitted16 September 1994
Permission granted1 February 1996
17 months after submission
Operational1 February 1998
24 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Dudley: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Dudley EfW’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
1.82 km
Advanced Conversion Technologies · Operational
1.13.5 km
Advanced Conversion Technologies · Operational
404.3 km
Landfill Gas · Operational
4.44.8 km
Solar Photovoltaics · Operational
15.2 km
Solar Photovoltaics · Operational
5.5 km
Battery · Operational
45.8 km
Battery · Operational
575.9 km

How big is Dudley EfW?

Dudley EfW has a recorded installed capacity of 7.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dudley EfW?

REPD records the operator as MES Environmental (CNIM Group). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dudley EfW approved and built?

The application was submitted on 16 September 1994. Permission was granted on 1 February 1996, 17 months later. The site became operational on 1 February 1998, 24 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 813.