Renewable sites › DPD Distribution Centre
DPD Distribution Centre
DPD Distribution Centre is operational in Sandwell with a recorded capacity of 1 MW, and has been generating since 2017-01-10.
Planning and build timeline
| Application submitted | 2015-11-27 |
| Permission granted | 2015-12-30 1 months after submission |
| Operational | 2017-01-10 12 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Sandwell’s record on solar
Sandwell has decided 19 solar farms and approved 100%, taking a median of 1.7 months. See every solar farm decision in Sandwell →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Kelvin Energy Recovery Facility EfW Incineration · Under Construction | 47 | 0.8 km |
Kelvin Energy Recovery Facility EfW Incineration · Under Construction | 47 | 0.8 km |
Oldbury Advanced Conversion Technologies · Operational | 40 | 1.7 km |
Edwin Richards Landfill Scheme Landfill Gas · Operational | 1.8 | 4 km |
Golds Hill - Battery Storage Battery · Operational | 57 | 4.2 km |
Dudley EfW EfW Incineration · Operational | 7.4 | 5.2 km |
Wednesbury EfW Incineration · Under Construction | 2 | 5.3 km |
Bustleholme Substation Battery · Operational | 49.9 | 6.3 km |
How big is DPD Distribution Centre?
DPD Distribution Centre has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates DPD Distribution Centre?
REPD records the operator as DPD. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was DPD Distribution Centre approved and built?
The application was submitted on 2015-11-27. Permission was granted on 2015-12-30, 1 months later. The site became operational on 2017-01-10, 12 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6314.