Renewable sites › Cradley Heath
Cradley Heath
Cradley Heath is an operational 1.1 MW advanced conversion plant in Sandwell, generating since 4 October 2014. REPD does not record the planning grant date. Operator of record: Intervate Renewable Energy.
Planning and build timeline
| Application submitted | 4 July 2013 |
| Permission granted | not recorded |
| Operational | 4 October 2014 |
Screening a site of your own?
Redline runs the record on your own boundary in Sandwell: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Cradley Heath’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 1.8 | 2.8 km |
EfW Incineration · Operational | 7.4 | 3.5 km |
Advanced Conversion Technologies · Operational | 40 | 6.5 km |
Solar Photovoltaics · Operational | 1 | 6.5 km |
Solar Photovoltaics · Operational | — | 6.7 km |
Landfill Gas · Operational | 4.4 | 7 km |
EfW Incineration · Under Construction | 47 | 7.2 km |
EfW Incineration · Under Construction | 47 | 7.2 km |
How big is Cradley Heath?
Cradley Heath has a recorded installed capacity of 1.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Cradley Heath?
REPD records the operator as Intervate Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Cradley Heath approved and built?
The application was submitted on 4 July 2013. REPD does not record a grant date. The site became operational on 4 October 2014.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4975.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode