Edwin Richards Landfill Scheme is an operational 1.8 MW landfill gas site in Sandwell, generating since 1 June 2002. REPD does not record the planning grant date. Operator of record: Waste Recycling Group.

1.8 MW
Capacity
as recorded in REPD
Operational
Status
since 1 June 2002
Landfill Gas
Technology
Waste Recycling Group
Sandwell
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1 June 2002

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Sandwell: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Edwin Richards Landfill Scheme’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
EfW Incineration · Operational
7.42 km
Advanced Conversion Technologies · Operational
1.12.8 km
Advanced Conversion Technologies · Operational
403.7 km
Solar Photovoltaics · Operational
14 km
EfW Incineration · Under Construction
474.7 km
EfW Incineration · Under Construction
474.7 km
Battery · Operational
576.1 km
Landfill Gas · Operational
4.46.8 km

How big is Edwin Richards Landfill Scheme?

Edwin Richards Landfill Scheme has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Edwin Richards Landfill Scheme?

REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Edwin Richards Landfill Scheme approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 June 2002.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 556.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode