Cwmcaesingrug Farm is operational in Caerphilly with a recorded capacity of 10 MW, and has been generating since 2015-03-02.
Planning and build timeline
| Application submitted | 2014-05-06 |
| Permission granted | 2014-08-08 3 months after submission |
| Operational | 2015-03-02 7 months after consent |
Caerphilly’s record on solar
Caerphilly has decided 7 solar farms and approved 100%, taking a median of 3.5 months. See every solar farm decision in Caerphilly →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Penrhiwarwydd Farm Solar Photovoltaics · Operational | 8.5 | 0.8 km |
Upper Pant-Ysgawen Farm/Crumlin Solar Photovoltaics · Operational | 4.9 | 4.3 km |
Oakdale Business Park Wind Onshore · Operational | 4 | 5.8 km |
Land at Darran Farm Solar Photovoltaics · Operational | 2.6 | 6 km |
Cwrt Henllys Farm Solar Photovoltaics · Operational | 5 | 6.4 km |
Gelliargwellt Uchaf Farm AD Anaerobic Digestion · Operational | 1.4 | 7.6 km |
Manmoel Road Solar Park Solar Photovoltaics · Operational | 4.1 | 7.7 km |
Hendai Farm Solar Photovoltaics · Operational | 13.4 | 8.6 km |
How big is Cwmcaesingrug Farm?
Cwmcaesingrug Farm has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Cwmcaesingrug Farm?
REPD records the operator as Kronos Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Cwmcaesingrug Farm approved and built?
The application was submitted on 2014-05-06. Permission was granted on 2014-08-08, 3 months later. The site became operational on 2015-03-02, 7 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1985.