Cwrt Henllys Farm
Cwrt Henllys Farm is an operational 5 MW solar farm in Torfaen, generating since 29 December 2016. Planning permission was granted on 16 June 2016, 11 months after submission. Operator of record: Lightsource Renewable Energy.
Planning and build timeline
| Application submitted | 22 July 2015 |
| Permission granted | 16 June 2016 11 months after submission |
| Operational | 29 December 2016 6 months after consent |
Screening a site of your own?
Torfaen approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Cwrt Henllys Farm’s recorded coordinate — swap in your own postcode or coordinates.
Torfaen’s record on solar
Torfaen has decided 5 solar farms and approved 100%, taking a median of 3.4 months. See every solar farm decision in Torfaen →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 8.5 | 5.6 km |
Solar Photovoltaics · Operational | 4 | 6 km |
Solar Photovoltaics · Operational | 10 | 6.4 km |
Solar Photovoltaics · Operational | 2 | 6.7 km |
Solar Photovoltaics · Operational | 4.9 | 7.6 km |
Solar Photovoltaics · Operational | 4.9 | 8 km |
Landfill Gas · Operational | 2 | 8.4 km |
Wind Onshore · Operational | 4 | 9.7 km |
How big is Cwrt Henllys Farm?
Cwrt Henllys Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Cwrt Henllys Farm?
REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Cwrt Henllys Farm approved and built?
The application was submitted on 22 July 2015. Permission was granted on 16 June 2016, 11 months later. The site became operational on 29 December 2016, 6 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5524.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode