Carver Hay, moss lane is an operational 2.5 MW solar farm in South Ribble, generating since 20 March 2017. Planning permission was granted on 15 December 2015, 2 months after submission. Operator of record: Navitas Project.
Planning and build timeline
| Application submitted | 1 October 2015 |
| Permission granted | 15 December 2015 2 months after submission |
| Operational | 20 March 2017 15 months after consent |
Screening a site of your own?
South Ribble approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Carver Hay, moss lane’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — South Ribble
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
South Ribble’s record on solar
South Ribble has decided 8 solar farms and approved 100%, taking a median of 1.4 months. See every solar farm decision in South Ribble →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Operational | 1.9 | 2.9 km |
Landfill Gas · Operational | 1.3 | 3.4 km |
Battery · Under Construction | 5 | 4 km |
Landfill Gas · Operational | 3.3 | 5.3 km |
Solar Photovoltaics · Operational | 1.3 | 5.8 km |
Solar Photovoltaics · Operational | 3.2 | 5.8 km |
Battery · Operational | 2 | 6 km |
Solar Photovoltaics · Operational | 1.7 | 7.5 km |
How big is Carver Hay, moss lane?
Carver Hay, moss lane has a recorded installed capacity of 2.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Carver Hay, moss lane?
REPD records the operator as Navitas Project. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Carver Hay, moss lane approved and built?
The application was submitted on 1 October 2015. Permission was granted on 15 December 2015, 2 months later. The site became operational on 20 March 2017, 15 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5838.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode