Renewable sitesClifton Marsh Waste Water Treatment Works

Clifton Marsh Waste Water Treatment Works

Clifton Marsh Waste Water Treatment Works is operational in Fylde with a recorded capacity of 2 MW, and has been generating since 2020-06-01.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 2020-06-01
Battery
Technology
United Utilities
Fylde
Authority
England

Planning and build timeline

Application submitted2019-08-01
Permission granted2019-08-28
1 months after submission
Operational2020-06-01
9 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Clifton Marsh Wastewater Treatment Works
Solar Photovoltaics · Operational
1.30.3 km
Clifton Marsh Wastewater Treatment Works
Solar Photovoltaics · Operational
3.20.6 km
Clifton Marsh Energy
Landfill Gas · Operational
3.31.5 km
Oakfield Farm
Solar Photovoltaics · Operational
52.3 km
Oakfield Farm - extension
Solar Photovoltaics · Operational
1.72.5 km
Cooper House Farm
Solar Photovoltaics · Operational
53.6 km
Carver Hay, moss lane
Solar Photovoltaics · Operational
2.56 km
Carr Farm (Farm AD)
Anaerobic Digestion · Operational
16.8 km

How big is Clifton Marsh Waste Water Treatment Works?

Clifton Marsh Waste Water Treatment Works has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Clifton Marsh Waste Water Treatment Works?

REPD records the operator as United Utilities. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Clifton Marsh Waste Water Treatment Works approved and built?

The application was submitted on 2019-08-01. Permission was granted on 2019-08-28, 1 months later. The site became operational on 2020-06-01, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7994.