Novarly ParcelRenewable sites

Renewable sitesCrimscote Solar Farm and Storage Project

Crimscote Solar Farm and Storage Project

Crimscote Solar Farm and Storage Project is a battery storage site under construction in Stratford-on-Avon. Planning permission was granted on 29 November 2022, 17 months after submission. Operator of record: Regener8 SPV1 Limited.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Regener8 SPV1 Limited
Stratford-on-Avon
Authority
England

Planning and build timeline

Application submitted18 June 2021
Permission granted29 November 2022
17 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Stratford-on-Avon approves 88% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Crimscote Solar Farm and Storage Project’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Stratford-on-Avon’s record on battery storage

Stratford-on-Avon has decided 8 battery storage schemes and approved 88%, taking a median of 5.3 months. See every battery storage scheme decision in Stratford-on-Avon

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
49.990 km
Solar Photovoltaics · Operational
54 km
Biomass (dedicated) · Operational
1.65.8 km
Solar Photovoltaics · Operational
2.87.8 km
Solar Photovoltaics · Operational
4.410.8 km
Solar Photovoltaics · Operational
2510.9 km
Battery · Operational
11.9 km
Solar Photovoltaics · Operational
3011.9 km

How big is Crimscote Solar Farm and Storage Project?

REPD does not record an installed capacity for Crimscote Solar Farm and Storage Project.

Who operates Crimscote Solar Farm and Storage Project?

REPD records the operator as Regener8 SPV1 Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Crimscote Solar Farm and Storage Project approved and built?

The application was submitted on 18 June 2021. Permission was granted on 29 November 2022, 17 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9395.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode