Renewable sitesCrimscote Solar Farm and Storage Project

Crimscote Solar Farm and Storage Project

Crimscote Solar Farm and Storage Project is under construction in Stratford-on-Avon.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Regener8 SPV1 Limited
Stratford-on-Avon
Authority
England

Planning and build timeline

Application submitted2021-06-18
Permission granted2022-11-29
17 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Stratford-on-Avon’s record on battery storage

Stratford-on-Avon has decided 8 battery storage schemes and approved 88%, taking a median of 5.3 months. See every battery storage scheme decision in Stratford-on-Avon

Other built sites within 15 km

SiteMWDistance
Crimscote Solar Farm and Storage Project
Solar Photovoltaics · Under Construction
49.990 km
Blackwell Grange Solar Farm
Solar Photovoltaics · Operational
54 km
Alscot
Biomass (dedicated) · Operational
1.65.8 km
Norton Hall
Solar Photovoltaics · Operational
2.87.8 km
Burton Farm
Solar Photovoltaics · Operational
4.410.8 km
Drayton Manor Farm
Solar Photovoltaics · Operational
2510.9 km
Littleton Solar Farm
Solar Photovoltaics · Operational
3011.9 km
Littleton Solar Farm
Battery · Operational
11.9 km

How big is Crimscote Solar Farm and Storage Project?

REPD does not record an installed capacity for Crimscote Solar Farm and Storage Project.

Who operates Crimscote Solar Farm and Storage Project?

REPD records the operator as Regener8 SPV1 Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Crimscote Solar Farm and Storage Project approved and built?

The application was submitted on 2021-06-18. Permission was granted on 2022-11-29, 17 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9395.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council