Renewable sites › Crimscote Solar Farm and Storage Project
Crimscote Solar Farm and Storage Project
Crimscote Solar Farm and Storage Project is under construction in Stratford-on-Avon with a recorded capacity of 49.99 MW.
Planning and build timeline
| Application submitted | 2021-06-18 |
| Permission granted | 2022-11-29 17 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Stratford-on-Avon’s record on solar
Stratford-on-Avon has decided 36 solar farms and approved 94%, taking a median of 3.7 months. See every solar farm decision in Stratford-on-Avon →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Crimscote Solar Farm and Storage Project Battery · Under Construction | — | 0 km |
Blackwell Grange Solar Farm Solar Photovoltaics · Operational | 5 | 4 km |
Alscot Biomass (dedicated) · Operational | 1.6 | 5.8 km |
Norton Hall Solar Photovoltaics · Operational | 2.8 | 7.8 km |
Burton Farm Solar Photovoltaics · Operational | 4.4 | 10.8 km |
Drayton Manor Farm Solar Photovoltaics · Operational | 25 | 10.9 km |
Littleton Solar Farm Solar Photovoltaics · Operational | 30 | 11.9 km |
Littleton Solar Farm Battery · Operational | — | 11.9 km |
How big is Crimscote Solar Farm and Storage Project?
Crimscote Solar Farm and Storage Project has a recorded installed capacity of 49.99 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Crimscote Solar Farm and Storage Project?
REPD records the operator as Regener8 SPV1 Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Crimscote Solar Farm and Storage Project approved and built?
The application was submitted on 2021-06-18. Permission was granted on 2022-11-29, 17 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9394.
Novarly Parcel · official public data, read properly · parcel.novarly.com