Blackwell Grange Solar Farm is operational in Stratford-on-Avon with a recorded capacity of 5 MW, and has been generating since 2017-03-15.
Planning and build timeline
| Application submitted | 2014-07-21 |
| Permission granted | 2016-03-01 19 months after submission |
| Operational | 2017-03-15 12 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Stratford-on-Avon’s record on solar
Stratford-on-Avon has decided 36 solar farms and approved 94%, taking a median of 3.7 months. See every solar farm decision in Stratford-on-Avon →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Crimscote Solar Farm and Storage Project Battery · Under Construction | — | 4 km |
Crimscote Solar Farm and Storage Project Solar Photovoltaics · Under Construction | 49.99 | 4 km |
Norton Hall Solar Photovoltaics · Operational | 2.8 | 8.3 km |
Alscot Biomass (dedicated) · Operational | 1.6 | 9.7 km |
Northwick Estate (Extension) Solar Photovoltaics · Operational | 2.2 | 12 km |
Springhill Solar Park (Northwick) Solar Photovoltaics · Operational | 5 | 12 km |
Willersey solar farm Battery · Operational | 1 | 12.9 km |
Littleton Solar Farm Solar Photovoltaics · Operational | 30 | 13 km |
How big is Blackwell Grange Solar Farm?
Blackwell Grange Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Blackwell Grange Solar Farm?
REPD records the operator as Conergy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Blackwell Grange Solar Farm approved and built?
The application was submitted on 2014-07-21. Permission was granted on 2016-03-01, 19 months later. The site became operational on 2017-03-15, 12 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1968.