Blackwell Grange Solar Farm

Blackwell Grange Solar Farm is operational in Stratford-on-Avon with a recorded capacity of 5 MW, and has been generating since 2017-03-15.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-15
Solar Photovoltaics
Technology
Conergy
Stratford-on-Avon
Authority
England

Planning and build timeline

Application submitted2014-07-21
Permission granted2016-03-01
19 months after submission
Operational2017-03-15
12 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Stratford-on-Avon’s record on solar

Stratford-on-Avon has decided 36 solar farms and approved 94%, taking a median of 3.7 months. See every solar farm decision in Stratford-on-Avon

Other built sites within 15 km

SiteMWDistance
Crimscote Solar Farm and Storage Project
Battery · Under Construction
4 km
Crimscote Solar Farm and Storage Project
Solar Photovoltaics · Under Construction
49.994 km
Norton Hall
Solar Photovoltaics · Operational
2.88.3 km
Alscot
Biomass (dedicated) · Operational
1.69.7 km
Northwick Estate (Extension)
Solar Photovoltaics · Operational
2.212 km
Springhill Solar Park (Northwick)
Solar Photovoltaics · Operational
512 km
Willersey solar farm
Battery · Operational
112.9 km
Littleton Solar Farm
Solar Photovoltaics · Operational
3013 km

How big is Blackwell Grange Solar Farm?

Blackwell Grange Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Blackwell Grange Solar Farm?

REPD records the operator as Conergy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Blackwell Grange Solar Farm approved and built?

The application was submitted on 2014-07-21. Permission was granted on 2016-03-01, 19 months later. The site became operational on 2017-03-15, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1968.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council