Novarly ParcelRenewable sites

Renewable sitesCreathorne Farm - Solar Farm

Creathorne Farm - Solar Farm

Creathorne Farm - Solar Farm is operational in Cornwall with a recorded capacity of 1.8 MW, and has been generating since 2014-08-01.

1.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-08-01
Solar Photovoltaics
Technology
Good Energy Generation
Cornwall
Authority
England

Planning and build timeline

Application submitted2013-01-13
Permission granted2013-09-03
8 months after submission
Operational2014-08-01
11 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cornwall’s record on solar

Cornwall has decided 146 solar farms and approved 92%, taking a median of 3.3 months. See every solar farm decision in Cornwall

Other built sites within 15 km

SiteMWDistance
Bradford Solar Park
Solar Photovoltaics · Operational
5.37.5 km
Northmoor
Solar Photovoltaics · Operational
58.3 km
Pitworthy Farm Solar Park
Solar Photovoltaics · Operational
15.68.8 km
Derril Water Solar Farm - Solar Farm
Solar Photovoltaics · Operational
428.8 km
CRINACOTT SOLAR FARM (Pyworthy)
Solar Photovoltaics · Operational
6.710.1 km
Land West of Parsonage Wood
Solar Photovoltaics · Operational
4.210.3 km
Canworthy Water
Solar Photovoltaics · Operational
4110.9 km
East Langford Farm
Solar Photovoltaics · Operational
511.7 km

How big is Creathorne Farm - Solar Farm?

Creathorne Farm - Solar Farm has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Creathorne Farm - Solar Farm?

REPD records the operator as Good Energy Generation. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Creathorne Farm - Solar Farm approved and built?

The application was submitted on 2013-01-13. Permission was granted on 2013-09-03, 8 months later. The site became operational on 2014-08-01, 11 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1614.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council