Renewable sites › Bradford Solar Park
Bradford Solar Park
Bradford Solar Park is an operational 5.3 MW solar farm in Torridge, generating since 21 March 2013. Planning permission was granted on 14 December 2011, 6 months after submission. Operator of record: Wessex Solar Energy.
Planning and build timeline
| Application submitted | 10 June 2011 |
| Permission granted | 14 December 2011 6 months after submission |
| Operational | 21 March 2013 15 months after consent |
Screening a site of your own?
Torridge approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Bradford Solar Park’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Torridge’s record on solar
Torridge has decided 28 solar farms and approved 96%, taking a median of 3.6 months. See every solar farm decision in Torridge →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 42 | 1.9 km |
Solar Photovoltaics · Operational | 6.7 | 3 km |
Solar Photovoltaics · Operational | 4.2 | 3.2 km |
Solar Photovoltaics · Operational | 5 | 3.4 km |
Solar Photovoltaics · Operational | 15.6 | 4.6 km |
Solar Photovoltaics · Operational | 3 | 5.3 km |
Solar Photovoltaics · Operational | 11.8 | 5.7 km |
Solar Photovoltaics · Operational | 5 | 6.8 km |
How big is Bradford Solar Park?
Bradford Solar Park has a recorded installed capacity of 5.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Bradford Solar Park?
REPD records the operator as Wessex Solar Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bradford Solar Park approved and built?
The application was submitted on 10 June 2011. Permission was granted on 14 December 2011, 6 months later. The site became operational on 21 March 2013, 15 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1158.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode