Renewable sites › Canworthy Water
Canworthy Water
Canworthy Water is an operational 41 MW solar farm in Cornwall, generating since 10 December 2014. Planning permission was granted on 21 January 2013, 5 months after submission. Operator of record: Equitix.
Planning and build timeline
| Application submitted | 22 August 2012 |
| Permission granted | 21 January 2013 5 months after submission |
| Operational | 10 December 2014 23 months after consent |
Screening a site of your own?
Cornwall approves 92% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Canworthy Water’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Cornwall’s record on solar
Cornwall has decided 146 solar farms and approved 92%, taking a median of 3.3 months. See every solar farm decision in Cornwall →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 5 | 3 km |
Solar Photovoltaics · Operational | 5 | 4.8 km |
Solar Photovoltaics · Operational | 5 | 6 km |
Solar Photovoltaics · Operational | 6.8 | 6.2 km |
Solar Photovoltaics · Operational | 5 | 6.4 km |
Wind Onshore · Operational | 6.6 | 7.6 km |
Wind Onshore · Operational | 3.2 | 8.7 km |
Wind Onshore · Under Construction | 0.9 | 9.1 km |
How big is Canworthy Water?
Canworthy Water has a recorded installed capacity of 41 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Canworthy Water?
REPD records the operator as Equitix. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Canworthy Water approved and built?
The application was submitted on 22 August 2012. Permission was granted on 21 January 2013, 5 months later. The site became operational on 10 December 2014, 23 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1630.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode