Novarly ParcelRenewable sites

Renewable sitesCrouch Solar Farm

Crouch Solar Farm

Crouch Solar Farm is an operational 49.9 MW battery storage site in Brentwood, generating since 30 October 2024. Planning permission was granted on 23 December 2021, 8 months after submission. Operator of record: Low Carbon Storage.

49.9 MW
Capacity
as recorded in REPD
Operational
Status
since 30 October 2024
Battery
Technology
Low Carbon Storage
Brentwood
Authority
England

Planning and build timeline

Application submitted7 May 2021
Permission granted23 December 2021
8 months after submission
Operational30 October 2024
34 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Brentwood: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Crouch Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
49.90 km
Solar Photovoltaics · Operational
5.22.2 km
Battery · Operational
282.8 km
Solar Photovoltaics · Operational
103 km
Battery · Operational
105.5 km
Solar Photovoltaics · Operational
56 km
Solar Photovoltaics · Under Construction
49.96.2 km
Battery · Under Construction
6.2 km

How big is Crouch Solar Farm?

Crouch Solar Farm has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Crouch Solar Farm?

REPD records the operator as Low Carbon Storage. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Crouch Solar Farm approved and built?

The application was submitted on 7 May 2021. Permission was granted on 23 December 2021, 8 months later. The site became operational on 30 October 2024, 34 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8358.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode