Brenkley Landfill

Brenkley Landfill is operational in Newcastle upon Tyne with a recorded capacity of 1.9 MW, and has been generating since 2003-12-01.

1.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2003-12-01
Landfill Gas
Technology
SITA UK / Natural Power
Newcastle upon Tyne
Authority
England

Planning and build timeline

Application submitted2001-06-05
Permission granted2002-05-16
11 months after submission
Operational2003-12-01
19 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Newcastle International Airport Phase 1 -Solar Farm
Solar Photovoltaics · Under Construction
33.8 km
Cramlington CHP
Biomass (dedicated) · Operational
27.74.6 km
MSD Cramlington
Wind Onshore · Operational
45.1 km
Seghill Village Waste Disposal Site phase 1 and 2
Landfill Gas · Operational
4.18.9 km
County Hall, Loansdean - Solar Array
Solar Photovoltaics · Operational
0.89.4 km
County Hall, Loansdean - Battery Storage
Battery · Operational
0.49.4 km
Excelsior Academy, Denton Road - Solar Panels
Solar Photovoltaics · Under Construction
0.5310.5 km
Blyth Sewage Treatment Works
Solar Photovoltaics · Operational
2.311.2 km

How big is Brenkley Landfill?

Brenkley Landfill has a recorded installed capacity of 1.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Brenkley Landfill?

REPD records the operator as SITA UK / Natural Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Brenkley Landfill approved and built?

The application was submitted on 2001-06-05. Permission was granted on 2002-05-16, 11 months later. The site became operational on 2003-12-01, 19 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 704.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council