Novarly ParcelRenewable sites

Renewable sitesBurton Wold Wind Farm South

Burton Wold Wind Farm South

Burton Wold Wind Farm South is operational in North Northamptonshire with a recorded capacity of 7.5 MW, and has been generating since 2017-04-24.

7.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-04-24
Wind Onshore
Technology
Infinergy/ Muirhall Energy
North Northamptonshire
Authority
England

Planning and build timeline

Application submitted2015-02-18
Permission granted2015-03-27
1 months after submission
Operational2017-04-24
25 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Northamptonshire’s record on onshore wind

North Northamptonshire has decided 9 onshore wind schemes and approved 67%, taking a median of 4.7 months. See every onshore wind scheme decision in North Northamptonshire

Other built sites within 15 km

SiteMWDistance
Burton Wold Wind Farm - Northern Extension
Wind Onshore · Operational
14.40.9 km
Burton Wold Windfarm
Wind Onshore · Operational
201.2 km
Cranford
Landfill Gas · Operational
1.12.9 km
Sidegate Lane
Landfill Gas · Operational
2.43.4 km
Sidegate Lane Landfill Site
Landfill Gas · Operational
1.33.4 km
Little Irchester, Higham Road Solar Farm
Solar Photovoltaics · Operational
4.67.1 km
London Road, Irchester - Solar Farm
Solar Photovoltaics · Operational
268.4 km
Wellingborough Solar Farm
Solar Photovoltaics · Operational
8.58.4 km

How big is Burton Wold Wind Farm South?

Burton Wold Wind Farm South has a recorded installed capacity of 7.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Burton Wold Wind Farm South?

REPD records the operator as Infinergy/ Muirhall Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Burton Wold Wind Farm South approved and built?

The application was submitted on 2015-02-18. Permission was granted on 2015-03-27, 1 months later. The site became operational on 2017-04-24, 25 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5277.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council