Cold Northcott is an operational 6.6 MW onshore wind farm in Cornwall, generating since 1 June 2002. REPD does not record the planning grant date. Operator of record: Otter Power.

6.6 MW
Capacity
as recorded in REPD
Operational
Status
since 1 June 2002
Wind Onshore
Technology
Otter Power
Cornwall
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1 June 2002

Screening a site of your own?

RedlineUK · £39

Cornwall approves 74% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Cold Northcott’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cornwall’s record on onshore wind

Cornwall has decided 35 onshore wind schemes and approved 74%, taking a median of 7.5 months. See every onshore wind scheme decision in Cornwall

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Under Construction
0.94.4 km
Wind Onshore · Operational
3.26.3 km
Battery · Operational
6.4 km
Solar Photovoltaics · Operational
4.26.4 km
Solar Photovoltaics · Operational
417.6 km
Solar Photovoltaics · Operational
59 km
Wind Onshore · Operational
9.211.2 km
Solar Photovoltaics · Operational
511.4 km

How big is Cold Northcott?

Cold Northcott has a recorded installed capacity of 6.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Cold Northcott?

REPD records the operator as Otter Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Cold Northcott approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 June 2002.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3511.