Renewable sites › Cold Northcott
Cold Northcott
Cold Northcott is operational in Cornwall with a recorded capacity of 6.6 MW, and has been generating since 2002-06-01.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2002-06-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Cornwall’s record on onshore wind
Cornwall has decided 35 onshore wind schemes and approved 74%, taking a median of 7.5 months. See every onshore wind scheme decision in Cornwall →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Lower Tregeen, Davidstow - Wind Turbine Wind Onshore · Under Construction | 0.9 | 4.4 km |
Otterham Down Wind Farm Wind Onshore · Operational | 3.2 | 6.3 km |
Saputo Dairy UK Battery · Operational | — | 6.4 km |
Saputo Dairy UK Solar Photovoltaics · Operational | 4.2 | 6.4 km |
Canworthy Water Solar Photovoltaics · Operational | 41 | 7.6 km |
Winsdon Farm Solar Photovoltaics · Operational | 5 | 9 km |
Delabole (Repowering) Wind Onshore · Operational | 9.2 | 11.2 km |
Grange Farm (Cornwall) Solar Photovoltaics · Operational | 5 | 11.4 km |
How big is Cold Northcott?
Cold Northcott has a recorded installed capacity of 6.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Cold Northcott?
REPD records the operator as Otter Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Cold Northcott approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2002-06-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3511.
Novarly Parcel · official public data, read properly · parcel.novarly.com