Novarly ParcelRenewable sites

Renewable sitesGrange Farm (Cornwall)

Grange Farm (Cornwall)

Grange Farm (Cornwall) is operational in Cornwall with a recorded capacity of 5 MW, and has been generating since 2013-02-28.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-02-28
Solar Photovoltaics
Technology
Vogt Solar
Cornwall
Authority
England

Planning and build timeline

Application submitted2011-03-04
Permission granted2011-05-24
3 months after submission
Operational2013-02-28
21 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cornwall’s record on solar

Cornwall has decided 146 solar farms and approved 92%, taking a median of 3.3 months. See every solar farm decision in Cornwall

Other built sites within 15 km

SiteMWDistance
Parabel North Beer Solar Farm
Solar Photovoltaics · Operational
6.81.8 km
West Ditchen Farm
Solar Photovoltaics · Operational
51.9 km
Winsdon Farm
Solar Photovoltaics · Operational
52.3 km
Canworthy Water
Solar Photovoltaics · Operational
414.8 km
Northmoor
Solar Photovoltaics · Operational
54.8 km
Nethercott Farm
Wind Onshore · Operational
1.57.2 km
Bradford Solar Park
Solar Photovoltaics · Operational
5.37.9 km
Derril Water Solar Farm - Solar Farm
Solar Photovoltaics · Operational
428.9 km

How big is Grange Farm (Cornwall)?

Grange Farm (Cornwall) has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Grange Farm (Cornwall)?

REPD records the operator as Vogt Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Grange Farm (Cornwall) approved and built?

The application was submitted on 2011-03-04. Permission was granted on 2011-05-24, 3 months later. The site became operational on 2013-02-28, 21 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1572.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council