Novarly ParcelRenewable sites

Renewable sitesSaputo Dairy UK

Saputo Dairy UK

Saputo Dairy UK is operational in Cornwall with a recorded capacity of 4.2 MW, and has been generating since 2022-03-31.

4.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2022-03-31
Solar Photovoltaics
Technology
Lightsource BP
Cornwall
Authority
England

Planning and build timeline

Application submitted2020-04-29
Permission granted2022-04-28
24 months after submission
Operational2022-03-31

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cornwall’s record on solar

Cornwall has decided 146 solar farms and approved 92%, taking a median of 3.3 months. See every solar farm decision in Cornwall

Other built sites within 15 km

SiteMWDistance
Saputo Dairy UK
Battery · Operational
0 km
Lower Tregeen, Davidstow - Wind Turbine
Wind Onshore · Under Construction
0.93.1 km
Otterham Down Wind Farm
Wind Onshore · Operational
3.24.7 km
Delabole (Repowering)
Wind Onshore · Operational
9.24.9 km
Cold Northcott
Wind Onshore · Operational
6.66.4 km
Canworthy Water
Solar Photovoltaics · Operational
4112.1 km
Kellygreen Farm
Solar Photovoltaics · Operational
412.2 km
Winsdon Farm
Solar Photovoltaics · Operational
514.4 km

How big is Saputo Dairy UK?

Saputo Dairy UK has a recorded installed capacity of 4.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Saputo Dairy UK?

REPD records the operator as Lightsource BP. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Saputo Dairy UK approved and built?

The application was submitted on 2020-04-29. Permission was granted on 2022-04-28, 24 months later. The site became operational on 2022-03-31.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6716.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council