Novarly ParcelRenewable sites

Renewable sitesChelveston Renewable Energy Park - Solar Extension

Chelveston Renewable Energy Park - Solar Extension

Chelveston Renewable Energy Park - Solar Extension is operational in North Northamptonshire with a recorded capacity of 19.5 MW, and has been generating since 2015-03-20.

19.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-20
Solar Photovoltaics
Technology
FEL Solar
North Northamptonshire
Authority
England

Planning and build timeline

Application submitted2014-06-23
Permission granted2014-10-17
4 months after submission
Operational2015-03-20
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Northamptonshire’s record on solar

North Northamptonshire has decided 41 solar farms and approved 98%, taking a median of 2 months. See every solar farm decision in North Northamptonshire

Other built sites within 15 km

SiteMWDistance
Chelveston Airfield
Solar Photovoltaics · Operational
160.3 km
Chelveston Renewable Energy Park Wind Farm (East Northamptonshire)
Wind Onshore · Operational
12.50.6 km
Chelveston Airfield - extension
Solar Photovoltaics · Operational
3.50.7 km
Chelveston Renewable Energy Park Wind Farm (Bedford)
Wind Onshore · Operational
100.7 km
Chelveston Renewable Energy Park
Battery · Under Construction
200.8 km
Westwood AD Plant (Farm AD)
Anaerobic Digestion · Operational
25.2 km
Glebe Farm Solar Energy Park
Solar Photovoltaics · Operational
157.1 km
Manor Farm - Pertenhall
Solar Photovoltaics · Operational
158.2 km

How big is Chelveston Renewable Energy Park - Solar Extension?

Chelveston Renewable Energy Park - Solar Extension has a recorded installed capacity of 19.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Chelveston Renewable Energy Park - Solar Extension?

REPD records the operator as FEL Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Chelveston Renewable Energy Park - Solar Extension approved and built?

The application was submitted on 2014-06-23. Permission was granted on 2014-10-17, 4 months later. The site became operational on 2015-03-20, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5258.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council