Novarly ParcelRenewable sites

Renewable sitesChelveston Renewable Energy Park - Solar Extension

Chelveston Renewable Energy Park - Solar Extension

Chelveston Renewable Energy Park - Solar Extension is an operational 19.5 MW solar farm in North Northamptonshire, generating since 20 March 2015. Planning permission was granted on 17 October 2014, 4 months after submission. Operator of record: FEL Solar.

19.5 MW
Capacity
as recorded in REPD
Operational
Status
since 20 March 2015
Solar Photovoltaics
Technology
FEL Solar
North Northamptonshire
Authority
England

Planning and build timeline

Application submitted23 June 2014
Permission granted17 October 2014
4 months after submission
Operational20 March 2015
5 months after consent

Screening a site of your own?

RedlineUK · £39

North Northamptonshire approves 98% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Chelveston Renewable Energy Park - Solar Extension’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Northamptonshire’s record on solar

North Northamptonshire has decided 41 solar farms and approved 98%, taking a median of 2 months. See every solar farm decision in North Northamptonshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
160.3 km
Wind Onshore · Operational
12.50.6 km
Solar Photovoltaics · Operational
3.50.7 km
Wind Onshore · Operational
100.7 km
Battery · Under Construction
200.8 km
Anaerobic Digestion · Operational
25.2 km
Solar Photovoltaics · Operational
157.1 km
Solar Photovoltaics · Operational
158.2 km

How big is Chelveston Renewable Energy Park - Solar Extension?

Chelveston Renewable Energy Park - Solar Extension has a recorded installed capacity of 19.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Chelveston Renewable Energy Park - Solar Extension?

REPD records the operator as FEL Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Chelveston Renewable Energy Park - Solar Extension approved and built?

The application was submitted on 23 June 2014. Permission was granted on 17 October 2014, 4 months later. The site became operational on 20 March 2015, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5258.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode