Chelveston Airfield - extension is operational in Bedford with a recorded capacity of 3.5 MW, and has been generating since 2014-09-30.

3.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-09-30
Solar Photovoltaics
Technology
Chelveston Renewable Energy
Bedford
Authority
England

Planning and build timeline

Application submitted2014-03-10
Permission granted2014-06-02
3 months after submission
Operational2014-09-30
4 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bedford’s record on solar

Bedford has decided 28 solar farms and approved 93%, taking a median of 2.7 months. See every solar farm decision in Bedford

Other built sites within 15 km

SiteMWDistance
Chelveston Airfield
Solar Photovoltaics · Operational
160.4 km
Chelveston Renewable Energy Park - Solar Extension
Solar Photovoltaics · Operational
19.50.7 km
Chelveston Renewable Energy Park Wind Farm (East Northamptonshire)
Wind Onshore · Operational
12.51.2 km
Chelveston Renewable Energy Park
Battery · Under Construction
201.2 km
Chelveston Renewable Energy Park Wind Farm (Bedford)
Wind Onshore · Operational
101.4 km
Westwood AD Plant (Farm AD)
Anaerobic Digestion · Operational
25.4 km
Glebe Farm Solar Energy Park
Solar Photovoltaics · Operational
157.3 km
Manor Farm - Pertenhall
Solar Photovoltaics · Operational
157.6 km

How big is Chelveston Airfield - extension?

Chelveston Airfield - extension has a recorded installed capacity of 3.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Chelveston Airfield - extension?

REPD records the operator as Chelveston Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Chelveston Airfield - extension approved and built?

The application was submitted on 2014-03-10. Permission was granted on 2014-06-02, 3 months later. The site became operational on 2014-09-30, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1788.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council