Novarly ParcelRenewable sites

Renewable sitesManor Farm - Pertenhall

Manor Farm - Pertenhall

Manor Farm - Pertenhall is an operational 15 MW solar farm in Bedford, generating since 17 October 2015. Planning permission was granted on 19 November 2014, 6 months after submission. Operator of record: Prosolia UK.

15 MW
Capacity
as recorded in REPD
Operational
Status
since 17 October 2015
Solar Photovoltaics
Technology
Prosolia UK
Bedford
Authority
England

Planning and build timeline

Application submitted20 May 2014
Permission granted19 November 2014
6 months after submission
Operational17 October 2015
11 months after consent

Screening a site of your own?

RedlineUK · £39

Bedford approves 93% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Manor Farm - Pertenhall’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bedford’s record on solar

Bedford has decided 28 solar farms and approved 93%, taking a median of 2.7 months. See every solar farm decision in Bedford

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
405.2 km
Solar Photovoltaics · Operational
5.36.3 km
Solar Photovoltaics · Operational
0.57.6 km
Solar Photovoltaics · Operational
3.57.6 km
Solar Photovoltaics · Operational
168 km
Solar Photovoltaics · Operational
19.58.2 km
Wind Onshore · Operational
12.58.6 km
Battery · Under Construction
208.7 km

How big is Manor Farm - Pertenhall?

Manor Farm - Pertenhall has a recorded installed capacity of 15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Manor Farm - Pertenhall?

REPD records the operator as Prosolia UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Manor Farm - Pertenhall approved and built?

The application was submitted on 20 May 2014. Permission was granted on 19 November 2014, 6 months later. The site became operational on 17 October 2015, 11 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2299.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode