Chelveston Airfield

Chelveston Airfield is operational in Bedford with a recorded capacity of 16 MW, and has been generating since 2014-02-28.

16 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-02-28
Solar Photovoltaics
Technology
Chelveston Renewable Energy Limited
Bedford
Authority
England

Planning and build timeline

Application submitted2012-12-19
Permission granted2013-04-25
4 months after submission
Operational2014-02-28
10 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bedford’s record on solar

Bedford has decided 28 solar farms and approved 93%, taking a median of 2.7 months. See every solar farm decision in Bedford

Other built sites within 15 km

SiteMWDistance
Chelveston Renewable Energy Park - Solar Extension
Solar Photovoltaics · Operational
19.50.3 km
Chelveston Airfield - extension
Solar Photovoltaics · Operational
3.50.4 km
Chelveston Renewable Energy Park Wind Farm (East Northamptonshire)
Wind Onshore · Operational
12.50.8 km
Chelveston Renewable Energy Park
Battery · Under Construction
201 km
Chelveston Renewable Energy Park Wind Farm (Bedford)
Wind Onshore · Operational
101 km
Westwood AD Plant (Farm AD)
Anaerobic Digestion · Operational
25.2 km
Glebe Farm Solar Energy Park
Solar Photovoltaics · Operational
157.1 km
Manor Farm - Pertenhall
Solar Photovoltaics · Operational
158 km

How big is Chelveston Airfield?

Chelveston Airfield has a recorded installed capacity of 16 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Chelveston Airfield?

REPD records the operator as Chelveston Renewable Energy Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Chelveston Airfield approved and built?

The application was submitted on 2012-12-19. Permission was granted on 2013-04-25, 4 months later. The site became operational on 2014-02-28, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1949.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council