Renewable sites › Chelveston Renewable Energy Park Wind Farm (East Northamptonshire)
Chelveston Renewable Energy Park Wind Farm (East Northamptonshire)
Chelveston Renewable Energy Park Wind Farm (East Northamptonshire) is operational in North Northamptonshire with a recorded capacity of 12.5 MW, and has been generating since 2014-02-15.
Planning and build timeline
| Application submitted | 2010-03-03 |
| Permission granted | 2012-06-29 28 months after submission |
| Operational | 2014-02-15 20 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Northamptonshire’s record on onshore wind
North Northamptonshire has decided 9 onshore wind schemes and approved 67%, taking a median of 4.7 months. See every onshore wind scheme decision in North Northamptonshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Chelveston Renewable Energy Park - Solar Extension Solar Photovoltaics · Operational | 19.5 | 0.6 km |
Chelveston Renewable Energy Park Wind Farm (Bedford) Wind Onshore · Operational | 10 | 0.7 km |
Chelveston Airfield Solar Photovoltaics · Operational | 16 | 0.8 km |
Chelveston Renewable Energy Park Battery · Under Construction | 20 | 1.1 km |
Chelveston Airfield - extension Solar Photovoltaics · Operational | 3.5 | 1.2 km |
Westwood AD Plant (Farm AD) Anaerobic Digestion · Operational | 2 | 4.7 km |
Glebe Farm Solar Energy Park Solar Photovoltaics · Operational | 15 | 6.5 km |
Little Irchester, Higham Road Solar Farm Solar Photovoltaics · Operational | 4.6 | 8.2 km |
How big is Chelveston Renewable Energy Park Wind Farm (East Northamptonshire)?
Chelveston Renewable Energy Park Wind Farm (East Northamptonshire) has a recorded installed capacity of 12.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Chelveston Renewable Energy Park Wind Farm (East Northamptonshire)?
REPD records the operator as Chelveston Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Chelveston Renewable Energy Park Wind Farm (East Northamptonshire) approved and built?
The application was submitted on 2010-03-03. Permission was granted on 2012-06-29, 28 months later. The site became operational on 2014-02-15, 20 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3946.
Novarly Parcel · official public data, read properly · parcel.novarly.com