Novarly ParcelRenewable sites

Renewable sitesChelveston Renewable Energy Park Wind Farm (East Northamptonshire)

Chelveston Renewable Energy Park Wind Farm (East Northamptonshire)

Chelveston Renewable Energy Park Wind Farm (East Northamptonshire) is an operational 12.5 MW onshore wind farm in North Northamptonshire, generating since 15 February 2014. Planning permission was granted on 29 June 2012, 28 months after submission. Operator of record: Chelveston Renewable Energy.

12.5 MW
Capacity
as recorded in REPD
Operational
Status
since 15 February 2014
Wind Onshore
Technology
Chelveston Renewable Energy
North Northamptonshire
Authority
England

Planning and build timeline

Application submitted3 March 2010
Permission granted29 June 2012
28 months after submission
Operational15 February 2014
20 months after consent

Screening a site of your own?

RedlineUK · £39

North Northamptonshire approves 67% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Chelveston Renewable Energy Park Wind Farm (East Northamptonshire)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Northamptonshire’s record on onshore wind

North Northamptonshire has decided 9 onshore wind schemes and approved 67%, taking a median of 4.7 months. See every onshore wind scheme decision in North Northamptonshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
19.50.6 km
Wind Onshore · Operational
100.7 km
Solar Photovoltaics · Operational
160.8 km
Battery · Under Construction
201.1 km
Solar Photovoltaics · Operational
3.51.2 km
Anaerobic Digestion · Operational
24.7 km
Solar Photovoltaics · Operational
156.5 km
Solar Photovoltaics · Operational
4.68.2 km

How big is Chelveston Renewable Energy Park Wind Farm (East Northamptonshire)?

Chelveston Renewable Energy Park Wind Farm (East Northamptonshire) has a recorded installed capacity of 12.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Chelveston Renewable Energy Park Wind Farm (East Northamptonshire)?

REPD records the operator as Chelveston Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Chelveston Renewable Energy Park Wind Farm (East Northamptonshire) approved and built?

The application was submitted on 3 March 2010. Permission was granted on 29 June 2012, 28 months later. The site became operational on 15 February 2014, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3946.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode