Renewable sites › Westwood AD Plant (Farm AD)
Westwood AD Plant (Farm AD)
Westwood AD Plant (Farm AD) is operational in North Northamptonshire with a recorded capacity of 2 MW, and has been generating since 2009-06-30.
Planning and build timeline
| Application submitted | 2008-01-11 |
| Permission granted | 2008-05-15 4 months after submission |
| Operational | 2009-06-30 14 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Glebe Farm Solar Energy Park Solar Photovoltaics · Operational | 15 | 2.1 km |
Odell Glebe Solar Farm Solar Photovoltaics · Operational | 16.8 | 4.1 km |
Airfield Farm (Podington) Wind Onshore · Operational | 8.6 | 4.2 km |
Chelveston Renewable Energy Park Wind Farm (East Northamptonshire) Wind Onshore · Operational | 12.5 | 4.7 km |
Chelveston Airfield Solar Photovoltaics · Operational | 16 | 5.2 km |
Chelveston Renewable Energy Park - Solar Extension Solar Photovoltaics · Operational | 19.5 | 5.2 km |
Chelveston Airfield - extension Solar Photovoltaics · Operational | 3.5 | 5.4 km |
Chelveston Renewable Energy Park Wind Farm (Bedford) Wind Onshore · Operational | 10 | 5.4 km |
How big is Westwood AD Plant (Farm AD)?
Westwood AD Plant (Farm AD) has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Westwood AD Plant (Farm AD)?
REPD records the operator as Ancala Bioenergy (formerly Biogen). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Westwood AD Plant (Farm AD) approved and built?
The application was submitted on 2008-01-11. Permission was granted on 2008-05-15, 4 months later. The site became operational on 2009-06-30, 14 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 272.