Renewable sites › Carn Nicholas Farm
Carn Nicholas Farm
Carn Nicholas Farm is a 5 MW solar farm under construction in Swansea. Planning permission was granted on 14 December 2015, 4 months after submission. Operator of record: Suncredit UK.
Planning and build timeline
| Application submitted | 10 August 2015 |
| Permission granted | 14 December 2015 4 months after submission |
| Operational | not recorded |
Screening a site of your own?
Swansea approves 88% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Carn Nicholas Farm’s recorded coordinate — swap in your own postcode or coordinates.
Swansea’s record on solar
Swansea has decided 16 solar farms and approved 88%, taking a median of 4.5 months. See every solar farm decision in Swansea →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 10 | 0 km |
Solar Photovoltaics · Operational | 0.2 | 2.7 km |
Landfill Gas · Operational | 2.2 | 5.6 km |
Landfill Gas · Operational | 2 | 5.6 km |
Solar Photovoltaics · Operational | 5 | 6.2 km |
Hydrogen · Under Construction | 2.5 | 6.8 km |
Solar Photovoltaics · Operational | 4 | 6.9 km |
Solar Photovoltaics · Operational | 4 | 7.1 km |
How big is Carn Nicholas Farm?
Carn Nicholas Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Carn Nicholas Farm?
REPD records the operator as Suncredit UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Carn Nicholas Farm approved and built?
The application was submitted on 10 August 2015. Permission was granted on 14 December 2015, 4 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5593.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode