Novarly ParcelRenewable sites

Renewable sitesCanford

Canford

Canford is a 10 MW advanced conversion plant under construction in Bournemouth, Christchurch and Poole. Planning permission was granted on 1 July 2013, 7 months after submission. Operator of record: Syngas Products/ Canford Renewable Energy Ltd.

10 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Advanced Conversion Technologies
Technology
Syngas Products/ Canford Renewable Energy Ltd
Bournemouth, Christchurch and Poole
Authority
England

Planning and build timeline

Application submitted21 November 2012
Permission granted1 July 2013
7 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Bournemouth, Christchurch and Poole: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Canford’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
50.1 km
Hydrogen · Operational
0.90.1 km
Battery · Operational
0.1 km
Landfill Gas · Operational
60.5 km
Battery · Operational
155.5 km
Solar Photovoltaics · Operational
75.6 km
Landfill Gas · Operational
35.7 km
Solar Photovoltaics · Operational
3.85.7 km

How big is Canford?

Canford has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Canford?

REPD records the operator as Syngas Products/ Canford Renewable Energy Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Canford approved and built?

The application was submitted on 21 November 2012. Permission was granted on 1 July 2013, 7 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 956.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode