Novarly ParcelRenewable sites

Renewable sitesCanford

Canford

Canford is under construction in Bournemouth, Christchurch and Poole with a recorded capacity of 10 MW.

10 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Advanced Conversion Technologies
Technology
Syngas Products/ Canford Renewable Energy Ltd
Bournemouth, Christchurch and Poole
Authority
England

Planning and build timeline

Application submitted2012-11-21
Permission granted2013-07-01
7 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Dorset Green Solar Farm
Solar Photovoltaics · Operational
50.1 km
Dorset Green Hydrogen
Hydrogen · Operational
0.90.1 km
Dorset Green Battery
Battery · Operational
0.1 km
Whites Landfill Site (Canford)
Landfill Gas · Operational
60.5 km
Holes Bay
Battery · Operational
155.5 km
Bedborough Farm
Solar Photovoltaics · Operational
75.6 km
Beacon Hill
Landfill Gas · Operational
35.7 km
Woodtown Farm
Solar Photovoltaics · Operational
3.85.7 km

How big is Canford?

Canford has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Canford?

REPD records the operator as Syngas Products/ Canford Renewable Energy Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Canford approved and built?

The application was submitted on 2012-11-21. Permission was granted on 2013-07-01, 7 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 956.

Novarly Parcel · official public data, read properly · parcel.novarly.com