Renewable sitesBeacon Hill

Beacon Hill

Beacon Hill is operational in Dorset with a recorded capacity of 3 MW, and has been generating since 2004-12-01.

3 MW
Capacity
as recorded in REPD
Operational
Status
since 2004-12-01
Landfill Gas
Technology
Combined Landfill Projects (CLP) / SITA UK
Dorset
Authority
England

Planning and build timeline

Application submitted2001-12-28
Permission granted2002-07-05
6 months after submission
Operational2004-12-01
29 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Race farm
Solar Photovoltaics · Operational
6.12.3 km
Henbury Quarry
Solar Photovoltaics · Operational
3.92.5 km
Holes Bay
Battery · Operational
154.2 km
North of Newton Farm
Solar Photovoltaics · Operational
34.7 km
Dolmans Hill (Redbridge Farm) Solar Arrays
Solar Photovoltaics · Operational
55.2 km
Whites Landfill Site (Canford)
Landfill Gas · Operational
65.2 km
South Newton Farm
Solar Photovoltaics · Operational
11.35.2 km
Slepe Farm
Battery · Operational
0.35.3 km

How big is Beacon Hill?

Beacon Hill has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Beacon Hill?

REPD records the operator as Combined Landfill Projects (CLP) / SITA UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Beacon Hill approved and built?

The application was submitted on 2001-12-28. Permission was granted on 2002-07-05, 6 months later. The site became operational on 2004-12-01, 29 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 723.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council