Renewable sitesBurbo Bank

Burbo Bank

Burbo Bank is operational in DECC (S36) with a recorded capacity of 90 MW, and has been generating since 2007-10-18.

90 MW
Capacity
as recorded in REPD
Operational
Status
since 2007-10-18
Wind Offshore
Technology
Orsted (formerly Dong Energy)
DECC (S36)
Authority
England

Planning and build timeline

Application submitted2002-04-12
Permission granted2006-07-14
51 months after submission
Operational2007-10-18
15 months after consent

What this site sits on

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Burbo Bank Extension (Burbo Bank 2)
Wind Offshore · Operational
2585.7 km
Royal Seaforth Dock Wind Farm
Wind Onshore · Operational
310 km
Bidston Moss Landfill Scheme
Landfill Gas · Operational
2.311.3 km
Burbo Bank Energy Storage
Battery · Operational
212.1 km
Port of Liverpool - wind
Wind Onshore · Operational
1012.7 km
Hawthorne Road
Battery · Under Construction
2013.6 km
Jemmys Carr
Solar Photovoltaics · Under Construction
513.8 km
Land at Tip Field
Solar Photovoltaics · Under Construction
514.2 km

How big is Burbo Bank?

Burbo Bank has a recorded installed capacity of 90 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Burbo Bank?

REPD records the operator as Orsted (formerly Dong Energy). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Burbo Bank approved and built?

The application was submitted on 2002-04-12. Permission was granted on 2006-07-14, 51 months later. The site became operational on 2007-10-18, 15 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2487.