Burbo Bank is an operational 90 MW offshore wind farm in DECC (S36), generating since 18 October 2007. Planning permission was granted on 14 July 2006, 51 months after submission. Operator of record: Orsted (formerly Dong Energy).
Planning and build timeline
| Application submitted | 12 April 2002 |
| Permission granted | 14 July 2006 51 months after submission |
| Operational | 18 October 2007 15 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in DECC (S36): the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Burbo Bank’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
- Special Protection Area — Liverpool Bay
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Offshore · Operational | 258 | 5.7 km |
Wind Onshore · Operational | 3 | 10 km |
Landfill Gas · Operational | 2.3 | 11.3 km |
Battery · Operational | 2 | 12.1 km |
Wind Onshore · Operational | 10 | 12.7 km |
Battery · Under Construction | 20 | 13.6 km |
Solar Photovoltaics · Under Construction | 5 | 13.8 km |
Solar Photovoltaics · Under Construction | 5 | 14.2 km |
How big is Burbo Bank?
Burbo Bank has a recorded installed capacity of 90 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Burbo Bank?
REPD records the operator as Orsted (formerly Dong Energy). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Burbo Bank approved and built?
The application was submitted on 12 April 2002. Permission was granted on 14 July 2006, 51 months later. The site became operational on 18 October 2007, 15 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2487.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode