Capel Landfill

Capel Landfill is operational in Mole Valley with a recorded capacity of 1 MW, and has been generating since 2006-02-01.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2006-02-01
Landfill Gas
Technology
Hanson Brick Ltd
Mole Valley
Authority
England

Planning and build timeline

Application submitted2003-06-02
Permission granted2004-07-13
13 months after submission
Operational2006-02-01
19 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Brookhurst Wood (Waste AD)
Anaerobic Digestion · Operational
4.54 km
Brookhurst Wood Gas to Energy
Landfill Gas · Operational
5.14 km
Broockhurst Wood
Landfill Gas · Operational
25.8 km
St Peters Hall
Solar Photovoltaics · Operational
1.78.9 km
Dorking Battery Energy Storage System
Battery · Operational
610.4 km
Land at Christ�s Hospital School
Solar Photovoltaics · Operational
1.111.7 km
South Terminal Car Park Forecourt - Electric Vehicle Charging Forecourt
Battery · Under Construction
12 km
Five Oaks Solar Farm
Solar Photovoltaics · Operational
512.2 km

How big is Capel Landfill?

Capel Landfill has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Capel Landfill?

REPD records the operator as Hanson Brick Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Capel Landfill approved and built?

The application was submitted on 2003-06-02. Permission was granted on 2004-07-13, 13 months later. The site became operational on 2006-02-01, 19 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 784.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council